Sunday, February 17, 2019

A look at the Equipment Programme and an ear for the Secretary of State's speech



Equipment Programme 2017: Category A and B projects

The MOD has published a FOI answer in which it details the names of the projects of category A (value exceeding 400 million pounds) and B (from 100 million to 400). The list does not provide any additional detail, but even so it is simply invaluable to better understand the 10 Years Equipment Programme.

The fact that the MOD is fine with revealing this list if specifically asked to do so, but does not include anything comparable in the EP document itself, is extremely irritating, and it proves once again that there is no security reason whatsoever for publishing such a vague EP document. As I’ve fully embraced the cause of greater accountability and transparence by the MOD in the handling of the defence budget, I will remark that in the future it should no longer be necessary to use FOIs to get this level of information. It would be very helpful to include it in the EP document itself.

Getting to the document, in addition to the really big programmes that are well known and expected to figure, the list does contain a number of voices worth touching upon. 


Complex Weapons

There are several voices here that are of enormous interest. One is the Category A project unimaginatively named “Battlefield Weapon”. It is hard to guess what this is, exactly. With the JAVELIN anti-tank missile having a notional OSD of 2025, the development of a new, more multi-role missile for the infantry might well be what’s hiding under this name. The British Army also has (or had?) a requirement for a “Reusable Multi-Role Medium Range Shoulder Launcher (MRSLs)” to introduce into the platoon to increase anti-structure and anti-infantry firepower and, effectively, replace the outgoing 60mm mortar. The expected date for contract award has however passed months ago without a selection being announced. The contenders were (are?) the Carl Gustav, which is enjoying a major renaissance being selected by both US Army and USMC as new Squad weapon; and the C90 Reusable.
MRSL might be hiding behind “Battlefield Weapon” as well, in theory, but it is not likely, also because even an Army-wide purchase of Carl Gustav would still not get anywhere near the 400 million mark.

There is also a “Tactical Guided Munition – Indirect”, which appears as a voice both under Procurement and under Support. This could hide the decade-old requirement for a guided 155mm shell solution for the Royal Artillery’s AS90 howitzers.

We also have, however, “Land Precision Strike”, which, if I had to guess, would be related to the GMLRS rockets. Again, there is no way to tell for sure. These are both Category A procurement programmes, so we are talking about sizeable projects for new capability. It would be hugely beneficial for the Army to procure the new GMLRS “Alternative Warhead” which restores area-effects lost with the demise of traditional sub-munitions, but I’m not sure an area-effect weapon would fit very well within the project name.

Finally, we have the “Deep Fire Rocket System”, again a Category A project. To comment on this one we have to note that for well over a decade the Royal Artillery has wanted a long range weapon, namely the ATACMS large rocket for the M270B1 launchers. 
We must also go back to the end of last year, when 16 RA Bty went into suspended animation, but with a most unusual promise of a relatively swift return to active service to operate a new Deep Fires capability. In the occasion it was said:
 “There is a plan in the middle of the 2020s around 2024 when we develop a new capability for the British Army and enhance some of our deep fire capabilities as part of a divisional fires regiment.”

While there is no way to confirm it, it seems very likely that the British Army intends to procure the new missile that the US Army is developing to replace ATACMS, the Long Range Precision Strike munition for GMLRS launchers. The standing up of a new battery for it, however, suggests that the launcher vehicle might also be new, and it is relatively easy to imagine that the army might be thinking of the wheeled HIMARS launcher, which would complement the tracked, heavier (but with more rockets ready for launch) M270. This solution would deliver wheeled GMLRS capability for the Strike Brigades and introduce a 500 km precision strike capability (or maybe even more than that if the INF treaty collapses for good. The LRPF is a prime candidate for quick range extension in that case).

HIMARS and LRPF for the Royal Artillery in the early 2020s? 

Curiously, the integration of Meteor on the F-35 also appears in the “Complex Weapons” budget rather than in the “Combat Air” one, as happens instead for weapons integration on the Typhoon. This might be due to the fact that the missile is to receive a new set of “clipped” wings as part of the integration. It might also have to do with its further development (GaN AESA radar seeker) under the name “Joint New Air to Air Missile”, a bi-national programme with Japan. JNAAM does not appear in the FOI: it is either part of “LII (Lightning II) Meteor integration” or is too small a budget to enter in category A and B.

There is a “Next Generation SPEAR” voice as well, which is not readily identified. Brimstone 2 Capability Sustainment Progamme (also known as Brimstone 3), SPEAR Cap 3 and Future Cruise and Anti-Ship Weapon are all listed separately, so this might revolve around the Paveway IV spiral development, or represent a whole new system.
In the Category B list it is worth noting two large purchases of Paveway IV bombs for arsenal replenishment: 1200 and 3500 bombs respectively.

There are also a “Javelin follow-on buy” voice, which might or might not include the purchase of the latest, multi-role Javelin F with improved blast-fragmentation effect for roles other than anti-tank.
The 4th Tranche of High Velocity Missiles (Starstreak) is also listed as Category B.
There is a Category A “Future Systems” which is as vague as it could be but no doubt covers all sort of studies.
The Storm Shadow Mid Life Refit is a Category A equipment support project. There is a “Future Ground Based Air Defence contingency” voice which is probably connected to FLAADS Land Ceptor (now Sky Sabre).
Complex Weapons budget includes also a “Medium Range Radar” voice which is probably ARTISAN. The inclusion of this and most of the Sea Ceptor costs in the Weapons budget explain why the Type 23 CSP appears so cheap.

Future Cruise and Anti-Ship Weapon is quoted as two programmes: FLRDFC is (probably) the replacement for Storm Shadow, but the exact meaning of the horrible acronym is uncertain. FC/ASW FOSUW should be the Future Offensive anti-Surface Weapon, the replacement for Harpoon on ships.

Brimstone 2 CSP is worth a mention as this programme should deliver a "Brimstone 3" round which is expected to replace Hellfire on the British Army's Apache Block III helicopters in the 2020s. By then the US Army will be transitioning to JAGM, and while Hellfire will remain a plenty big player for many more years, it will become progressively harder to support as the main customer moves on to the new system. Brimstone, on the british side, is the obvious solution. Brimstone 3 is also offered to France for the TIGER attack helicopter modernisation, but it is pretty easy to imagine that Paris will go with a MMP development or some other non-british solution, especially since a british purchase of VBCI has well and truly gone with the wind. 
It would be very interesting if Brimstone 3 added a launch mode that sees the missile dropped before the rocket ignites: this modification would enable integration of the 3 inside the F-35's bays. Currently, Brimstone is rail launched so is not compatible with confined spaces... 


LAND

In the Land Sector the big disappointment is the disappearance of the Armoured Battlefield Support Vehicle which brings the issue of replacing FV432 in armoured formations back to square one. It had been present up to the 2016 edition. Not for the first time I’m left wondering how the “Armoured Infantry 2026” overarching programme is supposed to ever deliver full operational capability if the Warrior CSP is not supported by a replacement for FV432. If they are looking at having MIV covering the role, I can only repeat my suggestion: bin WCSP and put the new turret on MIV. It would be absurd to have, say, the mortar team in support to a battalion of Warriors traveling on a wheeled AFV larger and heavier than the IFV itself… 

MITER and NAV-P are both present, however. MITER is a large Category A programme which aims to unify, in the 2020s, the provisions of the current C Fleet, Protected Plant fleet and Mechanical Handling Fleet.
The C Fleet comprises of engineering, construction and plant equipment to enable manoeuvre, construction, logistics, force protection engineering and life support. It is currently provided under a Private Finance Initiative contract which will end in 2021. The current small protected construction plant fleet is owned by the MOD and is mainly the result of UORs. It is now supported by industry under a contract also ending in 2021. The Defence Mechanical Handling Equipment is currently almost entirely provided under the DMHE contract, ending in 2020. The equipment fleet, composed of pure Commercial Off The Shelf kit, is owned by the contractor and provided to MOD on a period lease basis. Under MITER, the future contractor will manage and sustain the combined construction and mechanical handling equipment fleet in the United Kingdom, on deployed operations and overseas environments.

The Non Articulated Vehicle Programme is the replacement of DROPS. In July 2018 the MOD ordered the conversion of 382 of its MAN SV HX-77 trucks to be converted into Enhanced Pallized Load Systems EPLS, including 33 winterised/waterproofed for Royal Marines operations. 40 deliveries are planned early this year with final deliveries by the end of march 2021. Around 180 had been procured earlier on. NAVP will build on this interim solution to hopefully finally complete the DROPS replacement.

One notable absence, not easily explained, is the Multi Role Vehicle - Protected voice. The Foreign Military Sale authorization for up to 2,747 Joint Light Tactical Vehicles is dated 10 July 2017, so the programme was definitely ongoing already. But, up to that point it might, for internal accounting reasons, have been reported as a smaller-budget project? After all, no MRV-P candidate, not even the JLTV, is still fully and definitively selected. 
JLTV should cover the Group 1 requirement, while Bushmaster and Eagle 6x6 are still battling it out for the Group 2 requirement for a larger vehicle (selection might take place this year). Group 3 should cover the Light Recovery Vehicle. 
The absence of MRVP from the list is curious, but not necessarily concerning. However, MRVP does seem a remarkably vulnerable programme which might well be delayed once again in the near future as far too many priorities battle over a far too tight budget. 

Worth a mention is the Category B project TYRO for the upgrade or replacement of BR90 equipment, both Close Support (Titan-launched scissor bridges) and General Support (the ABLE system.
The latest variant of contract notice published for TYRO – Close Support adds a new vehicle requirement: a Wheeled Close Support Launch Vehicle that must be able to launch the same bridges as operated by Titan.
As of today, the Close Support bridge does not have anything like this: the supporting vehicle is a Unipower trucks that carries spare bridges but is not meant to launch them.
Up to 36 Wheeled Close Support Launch Vehicles are requested, and the inclusion of “Close Support” is significant because, keeping pace with army doctrine and definitions, it requires a vehicle that can operate in the Direct Fire zone. In other words, something offering a decent level of protection, because it is expected that there will be a fight going on while launching the bridge.


Not just Tank Bridge Transporters anymore. Under TYRO, a wheeled close support launch vehicle is now requested. The number of ABLE General Support bridges, on the other hand, shrinks to compensate. 

It is pretty evident that such a vehicle would deliver greatly enhanced bridging support to the Strike Brigades when compared to the Rapidly Emplaced Bridge System (REBS) which spans a smaller gap, is launched by a lightly protected MAN SV EPLS and has a Military Load Class limited to 50.
TYRO requests that all bridge elements are certified at least for MLC 100 (Tracked), which means that pretty much everything has to be able to cross.

There is no Project TRITON in sight yet, but it might just be because of timelines. The TRITON project for the procurement by 2027 of a replacement for the M3 rigs for Wide Wet Gap Crossing has been unveiled in late 2018 in the new Army’s newsletter. It probably hadn’t been firmed up yet in the 2017 plan.


ISTAR

ISTAR big projects are dominated by communications, and in particular Future Beyond Line of Sight, or SKYNET 6, the successor to the current constellation of comms satellites. As is know, a first “transitional” satellite, SKYNET 6A, has been ordered in summer 2017.

Many of the other voices are part of the Land Environment Tactical Communication Information Systems mega-programme for the renewal of comms at pretty much all levels. FALCON 2 EXPLOIT and EVOLVE both figure in the Category A programmes, and it is meant to expand on the capabilities of the current FALCON, which is the deployable High Bandwidth Backbone Network for the joint force, and primarily for the army.

Importantly, Dismounted Situational Awareness appears as a Cat A programme. It is part of the MORPHEUS communication system (data and voice radios and display for situational awareness) meant to progressively replace BOWMAN.

PICASSO also figures, and in this case we are talking of the national capability for strategic Imagery Intelligence (IMINT) and GEOInt, which provides commanders with information obtained from the analysis of date coming from national and multi-national collectors.

The Increment 1 and 2 of the Aliied Systems for GEOINT (AGS) are also included.


Combat Air

The elephant in the room, due to the current uncertainty surrounding it, is the UK-France Future Combat Air System, aka the UCAV for the 2030s. If we believe the press reports, France was ready to progress into a funded Demonstration phase and proceed with the building of prototypes, but the UK has refused to commit funding to that. Whether the programme survives, and in which form, is currently hard to say.

Then we have, of course, the national FCAS, better known in public as Project TEMPEST. Connected to it is also project PYRAMID, which is meant to develop the solutions for the MOD’s Mission System Reference Architecture for future Air Systems.

Worth of mention is Typhoon RADAR 1, a category A project meant to deliver a workable AESA radar for Typhoon Tranche 3 (and hopefully Tranche 2 too). The radar 1, or R1, is the baseline AESA in development for the consortium, but the UK’s intention is to eventually use a more ambitious R2 standard, with Electronic Warfare capability. R2 does not appear in the list, but this might simply be because the additional investment so far authorized over and above R1 funding does not yet qualify into Cat B. Some 60 millions were given to BAE Systems. A more recent version of the list might or might not display R2 since the Secretary of State for defence, speaking at RUSI on February 11, mentioned that the Transformation Fund includes another 60 million for the Typhoon radar. The 100 million mark, in other words, might now have been passed.

One notable Cat A project is the Watchkeeper Mid Life Update. Given the pricetag, it should include some serious improvements and additions. The Army has finally declared Full Operational Capability for Watchkeeper, but it is actually still struggling to secure the certifications needed to operate it from Boscombe Down as intended. Training on Salisbury Plain, in non-segregated air space, was the big promise of Watchkeeper and on this one point there isn't yet a happy ending. 


Air Support 

One surprising absence is ASDOT, which should more than qualify as Category A. It might, however, have been included into the rather incomprehensible “DCS+S - DOTC-A- Core System + Services”, which stands for Defence Operational Training Capability – Air. Its core component is the development of a Common Synthetic Environment that enables the connectivity between different simulators, in different locations, to enable articulate, large-scale simulations.

Another byzantine acronym is MSHATF PFI, but this is the well known 40-years Private Financing Initiative with CAE for the delivery of the Medium Support Helicopter Aircrew Training Facility in RAF Benson.

The Sentry CSP makes an appearance, but as we know the MOD’s preferred approach is not so much a Capability Sustainment Programme anymore, but rather replacement with new build E-7 Wedgetail.

Sentinel R1 capability and its “project team” are both Cat A programmes. Its mid-life update, with the addition of maritime radar mode and other upgrades, might be the explanation.


The Secretary of State for defence’s speech at RUSI

While it is clear that the uncertainty around the budget has not gone away, the Secretary’s speech should be welcomed as it signals that the armed forces have finally found a champion who truly has a vision for the UK’s role in the world.
For one, I was particularly pleased with it because it attempts to change a narrative of decline into a rather happier one in which the armed forces return to the center of the UK’s visibility in the world. I was of course particularly happy also because, in the last few months, defence policy has been heading in a direction which I had identified years ago and for which I’ve been campaigning as relentlessly as I could, while admittedly having a lot less time for blogging than in the past.

I was incredibly pleased to see the removal from service of the River Batch 1s being pushed to the right. My readers will known that ever since the River Batch 2s were ordered earlier than necessary, I’ve been saying that the only way to make them into a genuinely good story was to also keep in service the earlier ships. While at the moment it is a short-term promise only (a couple of years), the Royal Navy has confirmed that it will try to man them with the help of the Reserve, and if the scheme can be made to work successfully it will prove to be a massive force-multiplier. I believe that there are good chances that the three vessels will stay into service well beyond the next two years if the experiment is successful. In turn, this will allow some of the newer Batch 2 to be employed in constabulary tasks far away from home. You might have noticed that, following the experimental deployments of two River Batch 1s in the Caribbean in the last couple of years, the North Atlantic Patrol tasking is regularly quoted as part of the Batch 2’s missions. This is all the more likely to become routine if the Secretary’s “ambition” of restoring a more permanent and sizeable presence (or a “base”, even) in the Caribbean is realized.

The other massively welcome development, which I’ve also auspicated for a very long time, is the announcement of two “Littoral Strike Ships”. The image released on Twitter by the 1st Sea Lord is virtually identical to the American MV Ocean Trader, and so very, very similar to my proposal for aconverted Point-class RoRo vessel. However, at this stage the programme is still in concept phase and the exact look of the ship, as well as the decision for whether it will be newly built or perhaps converted from an existing vessel, is still up in the air.
While the announcement came a little “out of the blue” after months of gloomy reports of cuts, it was actually in the air from a while. Back in 2017, Jane’s reported that a concept study for a Multi Role Support Ship had been launched, to firm up options for a vessel with utility for amphibious, forward repair, and medical capability work.
More recently, during a hearing in front of the Defence Committee, the MOD’s deputy chief of staff for Military Capability, Lieutenant General Sir Mark William Poffley, said that a new programme for “support ships” was being considered for launch ahead of the Solid Support Ships, something i discussed in depth here.
Finally, reports emerged of two “hospital ships” to be jointly funded with DFID.
The Secretary’s speech, most evidently, is just the culmination of a quiet but determined campaign which has been progressing within the MOD for at least a couple of years.

It is pretty likely that these new vessels will cost the Navy the “optional” third Fleet Solid Support ship, but this is not a bad trade-off. Two supply vessels are enough to support the single large task group that the Royal Navy is able to generate, while these two new vessels will greatly help in a number of areas which would otherwise be very problematic. The loss of RFA Diligence without replacement, the lack of a realistic plan for replacing RFA Argus in 2024 and the fact that up to two thirds of the Landing Ship Dock hulls are actually unavailable for amphibious operations at any one time are 3 major concerns which I’ve been highlighting constantly over the years.

The Littoral Strike Ship's first concept art as posted by the 1st Sea Lord on Twitter. The MV Ocean Trader vibes are evident. 

 
All the way back in 2016 i made my very own "mad" suggestion for something similar to the MV Ocean Trader, but a bit more ambitious and even more flexible. If the Littoral Strike Ship was newly built rather than a conversion of an existing ship, it would not be impossible to incorporate all of these changes. 

The name “Littoral Strike Ships” is kind of misleading, as we are most likely looking at something which will be done on the cheap and will thus not be quite adequate for the more “fighty” operations that “strike” suggests. Multi Role Support Ship, while far less pyrotechnic, is probably still the best definition for these units.
The “new” Littoral Strike Groups announced by the Secretary, in fact, might not be based on the new ships, but rather on the existing Bay-class LSDs that these new hulls might end up releasing from the Caribbean and the Gulf respectively.
The Littoral Strike Groups will, realistically, be the continuation of the semi-experimental “Special Purpose Task Groups” that the Royal Marines have been sending out at sea in the last couple of years. These formations, normally of Company-group size and embarked on a single amphibious vessel, have been sent all the way to Pacific (HMS Albion’s tour of last year) and have repeatedly traveled in and out of Mediterranean and Indian Ocean (RFA Lyme Bay, most recently). The Littoral Strike Group should be a more capable evolution of the SPTG, hopefully enabled by the availability of extra supports, including escort vessels.
The new Littoral Strike Group will probably embark significant amounts of Marines and is likely to beat the Bay-class in aviation facilities (the MV Ocean Trader used as example has a two-bays hangar for medium helicopters and a two-spot flight deck that can take anything up to the gigantic CH-53), but is unlikely to have a dock in the stern. It will still be plenty useful, however, and if a RoRo / container ship hull is used, it will have enormous utility as additional strategic sealift.
With the right people and modular facilities on board it could also do decently as a Forward Repair and Support vessel, and it could be able to replace Argus in the medical role if able to embark a modular Role 3 hospital, for which the Navy could work alongside the Army for maximum efficiency.


The MV Ocean Trader, ex MV Cragside, after being modified for use by the US forces 

MV Cragside undergoing her transformation in Mobile, Alabama

The announcement of a RAF Squadron equipped with Swarming Drones is also a welcome development. The mention of this by the Secretary fueled a lot of comments, especially since he made it sound like the whole system would be ready by the end of the year. The MOD has subsequently clarified that it Is more a three years effort, and at the moment we can only speculate on the final form that this capability will take. The “end of 2019” mentioned by the Secretary might actually be for the formation of the squadron, which I figure could well start out as an experimental unit, much like the Fleet Air Arm’s own 700X NAS.
At the moment it is impossible to say if the LANCA (Lightweight Affordable Novel Combat Aircraft) low-cost UCAV, which was sought last year in a call for proposals to industry, is part of this effort or a parallel development.
The UK, however, was already experimenting with unmanned loyal wingmen back in 2008, when a modified Tornado took control, in flight, of a BAC 1-11 modified to serve as UAV; plus 3 other simulated unmanned aircraft. There clearly has been an interest in the capability for many years, and this fits into the wider campaign of experimentation ran by UK industry, which includes of course TARANIS, but also the very interesting BAE MAGMA which replaces flaps, ailerons and other moving surfaces with blown air taken from the engine. In other words, there are the capabilities to put together some good capability.
The result might be something like the Kratos XQ-58 Valkyrie intended to be used as part of the Low-Cost, Attritable Strike Unmanned Air System Demonstration for the USAF.
It will also be a step forwards on the way to unmanned companions for FCAS / TEMPEST. Replying to a House of Lords written question by Lord West on 14 february, Earl Howe wrote that “the combat air acquisition programme is looking at the replacement of Typhoon's capabilities and any new combat air system will need to be interoperable with the Carrier Enabled Power Projection (CEPP) programme. The concept phase of the acquisition programme will consider QEC basing for any unmanned force multipliers which may form part of the future combat air system.”
This reads as if the TEMPEST will not be carrier-capable (sadly, not a surprise and one of the reasons why the lack of catapults on the QE class remains regrettable) but the unmanned part of the future combat air system might be. This is very interesting, but it’s very early days and I’m somewhat skeptical still.



Williamson also mentioned a non-specified “VENOM kinetic strike capability” which is meant to give an attack capability to “ISTAR platforms”. UK Defence Journal says that, according to MOD sources, the platforms in question are the C-130J and the SHADOW R1 (soon to be R2 after the ongoing mid-life update programme).
The C-130J is not properly an ISTAR platform, but like the SHADOW R1 is commonly used in support to the Special Forces and there are several good options readily available for its armament.
It has now been confirmed that at least one C5 short-fuselage C-130 is being retained as part of the 14 that the RAF is going to keep in the long term. This is important because the tanking kit has only ever been installed on short-fuselage C-130s and might not be adaptable to the stretched ones. The HARVEST HAWK kit has been developed to equip short C-130s in tanker configuration (KC-130J). 

HARVEST HAWK originally swapped out one Air Refueling pod and replaced it with a quadruple launcher for Hellfire missiles. In addition, a palletized console is embarked into the cargo bay and a 10-cell launcher for GRIFFIN lightweight missiles was installed on the ramp. A TSS EO/IR turret is provided thanks to a modified external fuel tank. 


HARVEST HAWK evolution is continuing, however, and the USMC is replacing the TSS with a MX-20 EO/IR turret mounted under the nose, to restore the full fuel load. Moreover, with the Outer Wing Station 430 modification (OWS430), by 2020 they will have added two additional underwing pylons, doubling the capacity for externally-carried missiles while allowing the return of the Air Refueling pod. The new and improved HARVEST HAWK will restore 100% of its tanking potential while doubling its fire power at the same time. 
The missile launcher on the cargo ramp has been replaced by an enclosed launcher in a modified side door ("Derringer Door") which enables the launch of the missiles without requiring decompression and ramp opening. That also ensures that cargo capability is retained and requires less preparations before a mission. 
The USMC is also integrating the INTREPID TIGER II Electronic Warfare pod, while Hellfire will be replaced by JAGM. 

The RAF has only activated two pylons on its C-130J-30s so far, adding external fuel tanks to them in the last few years. 


In an ideal world, at least a second C5 should be retained and HARVEST HAWK kits, including AAR capability, should be procured for the pair. That would deliver a great firepower boost while also introducing in service a couple of tankers able to refuel helicopters. The Merlin HC4 is AAR capable and the Commando Helicopter Force wants to tap into that latent capability since extra range would obviously help a lot in all missions, including Joint Personnel Recovery.

Harvest Hawk in its original configuration. The 30mm gun pallet is on hold. 

The Special Forces are also known to want the capability, ideally on CHINOOK, and the SDSR 2015, in theory, promised them “longer range helicopters”.
Putting a couple of pylons and lightweight munitions such as MBDA’s VIPER-E on SHADOW R1 wouldn’t be difficult, either. But if I was in a position to make the choice, my priority would definitely be converting two C5 into KC-130Js and getting a pair of HARVEST HAWK kits for them at the same time.

PROTECTOR deserves a mention too, because we have recently been given the first official indication that maritime patrol capability could feature in the intended second batch (16 are on order, but there are 10 options as well and the stated intention remains to get to “at least 20”). Leonardo has showcased its SEASPRAY radar, which is ready for adoption on the centerline pylon (PROTECTOR will have 9 pylons overall, up from 5 on REAPER, or 7 counting the low-payload external ones, which in practice have never been used so far but would be good for, say, Sidewinder / ASRAAM). ULTRA is continuing work on its ASW sonobuoy-dispensing pods.
It is now contractually confirmed that PROTECTOR will be armed with Brimstone and Paveway IV and fitted with the Due Regard Radar, which was initially only going to be Fitted For But Not With. On the other hand, deliveries will happen later, and entry in service will arrive in 2023 rather than 2021, while the RAF is in the process of “decommissioning” one of its 10 Reapers. A curious development, might be because the UAV has suffered damage that is deemed not worthy to try and repair.

In his speech, Williamson briefly touched on the issue of Warrior upgrades, indirectly confirming that WCSP is going ahead. 2017 and 2018 have been tough and unpleasant years for the programme, which was called into serious question over the big delays accumulated (entry in service now to start in 2023 when it had once been 2018, then 2020…), but the ongoing trials at Bovington seem to have been positive enough that cancellation is no longer a possibility.  

A remotely operated, unmanned TERRIER was used to breach anti-tank obstacles during a demonstration ran by the US Army which also included unmanned M113s laying smoke to cover the action. The US Army is already seeking an Optionally Manned IFV for replacing Bradley. 

Also for the army, the Secretary remarked that he supports the fielding not just of unmanned logistic support vehicles, which have so far gotten most of the attention, but unmanned combat vehicles too.
At the latest AWE event, a WarriorIFV was converted into a remotely operated combat vehicle and I thinkt the demonstration opens up interesting possibilities. If I had to put my money on something in this area, it would be on surplus CRV(T) Scimitar to be converted in unmanned combat vehicles. Their insufficient protection would no longer be quite as concerning, while their awesome strategic and all-terrain mobility, as well as air mobility, would make them incredibly flexible in support of manned AFVs and infantry alike. The RARDEN is not a good weapon for an unmanned vehicle due to manual reloading and lack of stabilization, but there a few good options out there for replacing the turret and introduce an autocannon+missile combination that would be enormously capable.

Jordan's KADDB's proposal for upgunning CRV(T). Add remote control. The first British Army unmanned companion for much larger and less deployable manned AFVs? 

The Secretary also announced that funding will go towards equipping all infantry (including Royal Marines and RAF Regiment) with advanced night vision equipment which so far was reserved to Special Forces. This follows on similar decisions in the US and will go a long way in ensuring the Army can truly own the night. It could be argued that night vision is a major asymmetrical advantage over non-peer enemies, but that so far it hasn’t been exploited as much as it should have been. 


Some growth

In the coming months, 23 Amphibious Engineer Troop, in Germany, will be growing into a Squadron. Mothballed M3 rigs are being reactivated and the new ORBAT is being defined. With its M3 rigs, it will remain forward based in Germany, alongside its german counterpart and well positioned to continue training on the river Weser.

M3 rigs, british and german, in action during NATO exercises

This is also the year of the return of 28 Royal Engineer Regiment as a joint C-CBRN regiment is reformed after the idiotic SDSR 2010 cut. 28 RE Regt will take under command 77 Field Squadron, ex armoured squadron, which was part of 35 RE Regt until this converted into an EOD unit.
FALCON Sqn Royal Tank Regiment, with its FUCHS reconnaissance vehicles, will join the regiment in July.
27 Squadron RAF Regiment, the current CBRN specialist, will also join the new unit; 64 Headquarters & Support Squadron will form up this year and 42 Field Squadron will be re-established in 2020. There are also tentative plans for a reserve squadron to follow in 2022.

The Brigade of Gurkhas in particular is growing quickly to fill some gaps and help with the manpower deficit. This too is a U-turn on disastrous 2010 and 2011 choices. The Gurkhas now man Gurkha Company (Tavoleto) in its role of Training Support Company, part of the Specialist Weapons School at the Land Warfare Centre in Warminster.
Moreover, the Queen’s Own Gurkha Logistic Regiment is growing and two additional Gurkha sqns are appearing, one within 9 RLC Regt and one within 4 RLC Regt.
The Queen’s Gurkha Signals are growing by two squadrons as well, with 247 Sqn within 16 Signal Regt and 249 Sqn within 3 Divisional Signal Regiment.
The Queen’s Gurkha Engineers could also see growth in the near future. They have taken up significant roles within the ARRC support battalion, beginning in 2014 with the Close Support Troop and Engineer element.



Saturday, July 21, 2018

British Army going wheeled?



British Army going wheeled?

The MOD has released to the public a voluntary ex ante transparency notice in which it reveals that it has asked the Organisation for Joint Armament Cooperation (OCCAR) to enter a contract for the delivery of between 400 and 600 Boxer 8x8 for the Mechanised Infantry Vehicle programme.

The notice says that 4 variants are requested, in addition to driver training vehicles, reference vehicles and related support.
The four variants are not detailed, and subsequent reports are not in complete agreement. APC and Command variants are a given, and there seems to be a consensus on the third variant being the Ambulance, but the fourth variant is given as either a Mortar Carrier or an “Equipment Support Vehicle”, which presumably would combine Recovery and Repair functions in a single vehicle. It must be noted that both Mortar and Recovery/Repair variants of the Boxer aren’t yet in production and have not been ordered by anyone, although the development of both is a distinct possibility and one of the latest Boxer customers, Slovenia, has expressed a mortar requirement.
Naturally, the development of new mission modules is a possibility and could indeed represent a chance for the british industry to develop something that could be exported to other users.

What is most interesting in the notice is the number of vehicles that are anticipated: a first batch of at least 400 vehicles is significantly larger than the expected 300 – 350 that were commonly mentioned in recent times. 400 vehicles would comfortably cover the “Strike” requirement of 4 battalions, with substantial room for additional vehicles which would cover, probably, the replacement of FV432 variants in other formations; beginning, judging from the variants, with the FV432 ambulance which is found in tank regiments, armoured infantry battalions and armoured medical regiments. The Warrior CSP requirement is understood to be for 380 vehicles, of which 245 IFVs and the others in Joint Fires direction (FV524 variant) and the 522 and 523 REME variants. The number of battalions is the same, 4, so it is immediately evident that even the lowest quantity mentioned in the notice includes vehicles for roles outside the STRIKE infantry; or, less likely, an ambition for additional mechanized battalions.

The notice specifies that additional variants and requirements could follow, and it specifically mentions the adoption of a “medium gun”, basically implying an IFV variant.
Moreover, the notice specifies that the MOD is asking for the option of ordering up to 900 more vehicles, for a total of 1500.
1500 does not appear to be a casual number: the Army has been planning for 380 upgraded Warriors; declares on its website 409 FV432 still in use; and fields / stores a fleet of 305 Mastiff Troop Carrier Vehicles plus 127 specialistic variants (Enhanced Communications Variant, Interim ECM, Interim EOD [possibly 23], ambulance, Protected Eyes / Praetorian) plus 118 Ridgback Troop Carrier Vehicles and 51 specialistic variants (Command, Ambulance), supported by 125 Wolfhound (Utility and at least 44 between Military Working Dog and EOD).
The total is 1515. Coincidence? Probably no.

It seems more and more likely that the troubled Warrior CSP will, in the end, be cancelled. This MIV notice seems to prepare for a WCSP cancellation scenario by making provision for the numbers and the addition of a medium gun.
Moreover, it clearly includes numbers sufficient to cover the replacement of all remaining FV432 variants as well, which means that the Armoured Battlegroup Support Vehicle, officially “descoped” in 2016 as part of cost-growth management measures within the programme “Armoured Infantry 2026”, might just be dead for good, in favor of a huge MIV purchase.

The Warrior CSP has repeatedly missed its target dates and remains without a manufacture contract. Work is advanced on the turret and the 245 CTA40 guns are under contract, but it is not impossible to imagine a scenario which migrates the turrets onto Boxer hulls.
Lockheed Martin, perhaps genuinely aiming at future MIV requirements or perhaps shielding itself from the possibility of a WCSP cancellation, has already showcased its Export version of the turret on a Boxer.

The replacement of WCSP with more MIV would put the British Army on the same path chosen by France with the VBCI, which entirely replaced their own tracked IFVs. Moreover, the replacement of FV432 with MIV variants would represent a rather dramatic shift in favor of wheels, completely changing the scenario that currently exists within the British Army.   
Such a change of heart would do wonders for commonality and obsolescence removal from what is an aging fleet of fleets, but it would also sideline Ajax even further, leading to further questions about where the tracked heir to FRES should sit.
Ever since the SDSR 2015 was published, Ajax has looked more and more lost, ultimately resulting in its “re-branding” into a “medium armour” capability which has, it is fair to say, convinced very few people.
I’ve been and I continue to be a huge critic of the idea of leaving the armoured infantry brigades devoid of their own recce cavalry, especially if the reason to do so is to use the Ajax’s 40mm gun in support of toothless APCs in Strike Brigades. That, in my opinion, is the way to ruin both brigade types at once, destroying the capability of both.

Boxer showcased with the LM Export turret with CTA 40mm and double AT missile pod. 

Boxer with the LANCE turret with 30mm and Missiles, as selected by Australia. The module is being lifted out of the craddle. Or lowered in, depending on how you want to see it! 

A reassessment of how the various fleets will work together and how the various requirements can be covered has been a clear necessity for years, and has been a recurring theme in my posts on armour plans. A “full-MIV” scenario is not a bad outcome, and this notice seems to prepare the ground for such an approach, but it is absolutely regrettable that in the meanwhile hundreds of millions will have been expended for near zero return. If WCSP is cancelled, the Army will have once more wasted years and hundreds of millions for nothing.
Moreover, it is extraordinary that Ajax took less than a year from contract award to become a “problem”; a platform desperately looking for a role and place which is not in conflict with everything else.
Another rational alternative would be to renegotiate the Ajax contract if possible and add an IFV variant, which is being offered by General Dynamics for export, including to Australia. If Warrior CSP was cancelled in favor of an Ajax IFV variant, the british army could then concentrate all tracks in the armoured brigades and all wheels in the Strike brigades, which would enable the two formations to truly exploit their own strengths without the compromises imposed by a sub-optimal mix.
I can’t help but say it again: that the army has gotten this far without being able to formulate a comprehensive plan is an extraordinary failure, born not so much out of lack of money (Ajax is anything but cheap) but out of lack of long term vision.
I’d “gladly” sacrifice WCSP if it meant finally making a choice and getting on with it. This is the kind of thing that the Modernising Defence Programme should be about, but any residual bit of confidence in the process has been disintegrated by the insultingly pointless “statement” released this past week.


A variety of internal arrangements are offered. The Australian CRV comes with four dismounts, but an IFV variant with manned turret and a full team of 8 dismounts is also a possibility. Warrior CSP would have six dismounts; if replaced by more MIV it might allow an uplift in the number of dismounts without armoured infantry battalions

The Germans giving a visual demonstration of the payload of a Boxer APC

The notice notes that a 1500 vehicles programme could mean an expenditure of 11.5 billion over two decades. Is this unaffordable? For sure it would be challenging. However, in April 2014, the MOD decided to split the massive “Mounted Close Combat Capability Change” programme into four:

-          Armoured Cavalry 2025
-          Armoured Infantry 2026
-          Armour; Main Battle Tank 2025
-          Mechanized Infantry 2029

The date at the end indicates the desired completion time. The budget for the Mounted Close Combat super-programme was 17.251,83 million pounds, with a project end date set for 31 december 2033.
Data released this year, and current to September 2017, reveals that the Armoured Cavalry programme has a budget of 6258,19 million, for procuring, putting in service and supporting for the first few years the Ajax fleet.
The Armoured Infantry programme was composed by Warrior CSP, but was also meant to include the Armoured Battlegroup Support Vehicle programme. The budget was consistently given as higher than 2 billion, even when ABSV was descoped and pushed to the right with the ambition of becoming its own Categoary A programme. In the latest report, pretty much all data, including the budget value, is not disclosed for reasons of “commercial interest”, as the MOD is locked into discussions with Lockheed Martin, the prime contractor for WCSP.
The budget for the Challenger 2 LEP is also not disclosed although in previous years it danced between 700 and 900 million.
Mechanized Infantry 2029 seems to now be just “MIV”, and naturally, all numbers for it are hidden as well.
A part of those 17 billions has been of course expended, but the new “super-MIV” programme would extend past 2033 (significant costs are related to support in the long term, not to procurement). In theory, there were always going to be significant sums available for armour programmes, but keeping track of it is simply impossible due to the insufficient and often contradictory information released by the MOD.
Boxer modules already ordered by other countries. 
A Boxer module

Boxer module on its container-like frame for transport 

Industrially, Rheinmetall / ARTEC have put together an impressive proposal, with 100% assembly in the UK and a commitment to manufacture 60% of the vehicle value in the country. Before the MOD choice was announced, one of the two partners in the ARTEC consortium, Krauss-Maffei Wegmann (KMW), had already funded new tools at William Cook’s Sheffield and Leeds factories to prepare to manufacture the high strength steel castings, bullet and blast proof, for the Boxer.
A production line will be stood up in the UK, where “most” of the design work for eventual new, British-specific mission modules would take place, along with construction and integration of modules and final assembly of the vehicle.
ARTEC has taken onboard BAE Systems, Pearson Engineering, Raytheon U.K. and Thales U.K as partners for the Boxer programme, and a sizeable production run would bring a lot of work to the sector, for many years.

So far, Germany has ordered 272 BOXER starting in 2009, with a follow-on order recently for another 131. The Netherlands purchased 200 and the last delivery has just taken place. Lithuania ordered 88; Australia selected Boxer for its army reconnaissance vehicle requirement for 211 vehicles and 223 modules and Slovenia has selected the Boxer for its battlegroups and plans a first batch of 48 IFV.
The UK’s order will at least equal Germany’s and could, depending on follow-on decisions, become by far the largest. Indeed, if the options were to be exercised, the UK’s order would swell the Boxer fleet until it is the second largest 8x8 programme in NATO after the US Stryker.
This, obviously, would have a technical and economical impact on UK’s capability in the armoured vehicle sector.


Boxer's win in Australia after a long selection process was an important factor in the British Army's own decision. It could be another key area of cooperation after Type 26

Capability-wise, the Boxer is a proven solution and was all along the candidate with the best growth margins. Reportedly, the UK will go from the start with the “full-fat” variant sized for 38.5 tons gross weight, giving ample margin to add new capability, including turrets and weapons.
The Boxer notoriously uses a common hull which is “missionized” thanks to modules installed in the back cradle. This modularity is unlikely to ever be a major factor during operations (“swap module and role mid-way through an operation”) but greatly eases the addition and evolution of capabilities during the service life. The modules can be detached from the hull and mounted in container-sized cradles for transport or to be operated inside bases, once hooked up to power and services. This potentially eases training and can reduce somewhat the requirement for hulls: the Australian Army, notably, somewhat downsized its planned purchase (from 225 to 211 vehicles) and procured more mission modules than hulls.

Generic Vehicle Architecture-compliant modules for the UK can be developed and installed over the common hull.
If Warrior CSP ends up cancelled, one particularly important variant to be acquired would be the Joint Fires variant, and Australia's work in this area could bring beneficial lessons.  



A different British Army?

The Army could be the service bringing the most changes to the MDP table. Jane’s is reporting that Gurkha numbers will swell further, probably because there is never a shortage of willing Gurkhas to recruit. The biggest novelty is that next year Gurkhas will stand up their own Specialised Infantry Battalion. Not clear yet if it’ll be the “optional 5th” which was always given as a possibility or if they will replace 2 LANCS as the 4th such unit.
2nd PWRR converted to Specialised Infantry role this year, following 4 RIFLES and 1 SCOTS.

The rebuilding of the Gurkha numbers after the cuts ordered in 2011 had already been announced and i had written about it already two years ago. 
What has since been detailed is that 2 additional Gurkha squadrons will be raised to strengthen 10 Queen’s Own Gurkha Logistic Regiment, while 2 extra signal squadrons are standing up: one within 3rd UK Division Signal Regiment (249 Sqn) and one within 16 Signal Regiment (247 Sqn). Gurkha engineers growth is also expected, perhaps with a new squadron to be formed within 36 RE.

It is also now official that the Wide Wet Gap Crossing capability is to grow, with the stored M3 being reactivated, and it has been announced that the capability will stay put in Germany, along with vehicle storage and a presence at the Sennelager training facility. Details are still scarce: in particular, the M3 permanence in Germany means a change of plans for 75 Royal Engineers.

The Royal Signals are about to disband the short-lived 2 Signal Group, which was created within 11 Signal Brigade to control the reserve signal regiments under Army 2020. Reserve signal regiments are being resubordinated as their roles expand (notably with FALCON training and equipment). 32 and 39 Signal Regiments, of the reserve, have resubordinated to 1 Signal Brigade in support of ARRC and High Readiness formations. Further changes might follow as the Royal Signals looks at the creation of hybrid regiments of regulars and reservists.
10 Signal Regiment, given its specialized roles (from reserve ECM to installation specialists), is resubordinating directly under 11 Signal Brigade, while 37 and 71 joint the regular regiments within 7 Signal Group, 11 Signal Brigade.
The Army’s Information Manoeuvre Strategy which was half-announced by Fallon has not surfaced yet, but could bring great changes. According to what Fallon said at the times, it would bring together the Corps of Signals with the Military Intelligence Corps, and also bring the creation of a second EW regiment. Nothing has been heard or seen since, but hopefully one day we’ll know more.

The Royal Engineers are about to reform 35 RE into an EOD & Search regiment, joining 33 RE in the role, at the cost of one armoured close support engineering formation. 33 and 35 RE will contain the Regular EOD squadrons, while Reserve EOD will be once more centralized in its own regiment, 101 RE. This reverses, once more, an Army 2020 decision which had turned 33 and 101 into Hybrid regiments. One can’t help but notice the completely different directions followed by Signals and Engineers…
In the meanwhile, 12 HQ & Support Sqn has stood up anew in 23 (Parachute) RE, after the regiment took in some extra manpower as part of Army 2020 Refine. 12 had disbanded in 2013 as part of Army 2020 changes. 
Next year it is expected that 28 Royal Engineers will stand up as CBRN formation, presumably pulling in FALCON Sqn, Royal Tank Regiment (Fuchs and wide area surveillance) and the Light capabilities of 27 Squadron, RAF Regiment, which has already absorbed 26 Sqn and is now standing up a Parachute capability for support to high readiness formations.
The formation of a (joint?) CBRN regiment is, of course, another U-turn over 2010 decisions. Did you notice the trend yet…?

26 Royal Artillery is now 3rd Division's Fires specialist, with GMLRS and Exactor, which means there is one less AS90 regiment and that a number of batteries have resubordinated (such as 176 (Abu Klea) Bty moving from 19 to 26 RA, or H Bty (Ramsay's Troop) moving from 1 RHA to 26 RA, rallying under the flag of 19 (Gibraltar) Bty), while others have gone into suspended animation, namely 17 (Corunna) Bty and 38 (Seringapatam) Bty
This reverts the de-centralization of GMLRS which had taken place under Army 2020. I'll be honest and say that this was one of the very few things of Army 2020 which i actually appreciated, because having a wider spread of GMRLS and Exactor meant putting the capability where it needs to be. 
26 RA will still end up parcellized all the time, sending out batteries to be battlegrouped to support this or that brigade, and while there are probably advantages to having all GMLRS training and management in the same place, the mixed artillery regiment is, i believe, the right way to go. Notoriously, i'm a champion of the approach "structure and train as close as possible as to how you fight", and i've already said more than once that i'm also all in favor of permanent combined arms battalions with tanks and armoured infantry working shoulder to shoulder. 
I'm also a huge supporter of Exactor and would very much like to see it employed more widely, perhaps not by the Royal Artillery but directly by infantry and cavalry. For now at least, the Army is not "listening". But it eventually turned back on many of the decisions of Army 2020 that i thought made no sense, so perhaps one day... 

Meanwhile, 42 Air Defence Support Bty has been disbanded and 12 and 16 Royal Artillery regiments will rebuild their own dedicate support elements to be able to deploy independently. They had been joined at the hip by Army 2020 cuts and related force structure changes, but, once again, a U-turn has followed. 

These are mostly good news, but we might find unpleasant truths later on. The long-delayed report on the future of the Army Air Corps bases is still not coming out, and the promised 4 squadrons of Wildcat helicopters are still only 2, even though deliveries have ended. This is worrying.

There could be big changes coming if Warrior CSP is given up and an “all-MIV approach” is approved.
My own advice to the British Army is to consider a wide-ranging rethink of Cavalry, reconnaissance and ISTAR. The confusion over Ajax’s role and deployment within the brigades and the fact that the future of battlegroup ISTAR is up in the air with no endorsed path to a Desert Hawk III replacement is alarming, and shows that FIND doesn’t have enough of a voice, or of a direction.
The Royal Artillery and the Cavalry are reportedly sparring over who should be responsible for the post DH III FIND, and depending on who you listen to, the spar seems to be about staying OUT of the role. I had a discussion with a cavalryman who said that “playing around with toy aircraft” is not a Cavalry role. I think and hope he doesn’t speak for the whole Corps, but it certainly left me with the worst of impressions. FIND is a key function which deserves a lot more effort. Brigades without a dedicate reconnaissance unit are a terrible idea which shouldn’t even have been put forwards. And it is ridiculous to think that the British Army can seriously think about high intensity warfare while fielding a grand total of 5 counter-artillery radars, and short ranged too.
If it takes a specific “ISR Corps” to bring a more rational approach in the sector, so be it. Each brigade will need its own ISR formation which can conduct reconnaissance, counter-reconnaissance and surveillance of the area of operations. Most nations have been organizing their cavalry according to these requirements or forming specific battlefield surveillance brigades in the case of the US Army. Mast-mounted sensors, radars and unmanned vehicles, both air and ground, have become part of the cavalry mission pretty much anywhere, with the UK as the only notable exception.
Ajax, and with it the whole recce cavalry concept, seem to have bogged down somewhere midway between the Squadron of American Brigade Combat Teams and the 8x8-based cavalry squadrons planned by the Italian army.

The US Army cavalry squadron in armoured BCTs is now composed of a tank company with 14 Abrams MBTs and the “6x36” model, in which each Troop has two platoons of 6 Bradley IFVs, each carrying 3 crew and 3 dismounts. One every two vehicles in the Troop is fitted with a LRAS long-range sensor, and the Squadron has its UAV platoon with RQ-7 Shadow drones, plus HUMINT/IMINT intelligence element.
Wheeled BTCs on Stryker replace the MBTs with the Mobile Gun System and TOW variants of Stryker. Notoriously, the US Army is moving towards the introduction of 30mm guns on the other Strykers.
In practice, the American recce cavalry has moved towards greater firepower and a greater number of dismounts. The Americans also hold on for dear life to mounted 120mm mortars.



The Italian army intends to restructure its cavalry on homogeneous regiments each containing a squadron of 8x8 Centauro II tank-destroyers, with 120/45 mm cannons; 2 squadrons of Freccia 8x8 in two variants, FAR and CLOSE; and another squadron of supporting elements.
The Freccia FAR closes equipped with HORUS tube-launched UAVs and a combined radar-EO sensor which can be dismounted or deployed on a telescopic mast; while the CLOSE carries dismounts plus an unmanned ground vehicle UGV, while replacing the HORUS tubes with SPIKE anti-tank missiles.

An early Freccia Recon FAR shown with the LYRA radar selected for it, in dismounted mode. It will also employ the HORIZON optical sight. 

The UGV seen on the CLOSE's ramp 

This image shows the UGV, the Lyra radar and HORIZON sight near a Freccia Recon CLOSE
HORUS drone seen coming out of its launch box on the Freccia Recon FAR 

The Ajax is similar to the Bradley used by the American squadrons, but does not carry dismounts. Each Sabre Sqn will continue to have a support platoon with dismounts riding in Ares APCs, replacing the current Spartan, but it will be a small component.
We were told that there would be around 20 vehicles in a “Ground Based Surveillance” sub-variant of Ajax but it is not clear if it is still the case and what additional sensors, if any, this sub-variant will be able to bring to bear. Mast-mounted long range sensors are still nowhere to be seen, leaving Ajax essentially only with its main sight, which because of very questionable design decisions needs to be removed if a Protector remote weapon station is deemed necessary. Taken all together, these weaknesses expose just why I feel that the focus of the Ajax programme was sadly not really on ISR at all.

With the rush to Strike in 2015, Ajax is now attempting to re-invent itself as a “medium tank”, with at least half of the regiments literally leaving recce behind in favor of a combat role more akin to a real MBT.
This continues to be a rash and irrational decision, that the MDP should reverse.
Despite claims to the contrary, it looks like the Ajax family has been purchased as a one-for-one replacement of the Scimitar / Spartan combination, just much larger and heavier. Ajax as the dismount-less “tank”, with more protection and firepower but less deployability and stealth, supported by a handful of APCs carrying small teams of max four dismounts. There should be an “Overwatch” sub-variant of the Ares to give the formation some anti-tank punch, but it is not clear if it will offer any more capability than just carrying a Javelin dismounted team. In this sector, in many ways, the Army took a backward leap when it retired Striker and its Swingfire missiles back in 2005.

As it stands, the Ajax family does not have the firepower, nor the full range of sensors to be a truly capable ISR system. As for its attempt to be a Medium Tank, that is just insane.
The Army needs to approach the MDP as a chance to urgently reassess how Ajax will be used and distributed. A decision on WCSP is needed, and ABSV must absolutely be taken into account as well. If all the parts aren't considered within a much needed long term plan, the Army will end up in trouble again very soon.
And i will add that the Army also needs to organize the cavalry into a force that delivers the kind of ISR and punch that a modern brigade needs. And / or procure a "true" Medium Armour variant of Ajax, which would at least possess a more credible firepower.