Wire Guided Crane - Cleco - Automated Warehouse

The key element of the warehouse project involved the crane. A second crane was added to enable the facility to cope with the increased volume of material transactions.

A new multiple lane conveyor system was also added, increasing buffer storage during high demand and dramatically reducing crane efficiency.

The high bay racking system and warehouse floor were all renewed to increase longevity.