Calculate the total distance traveled by the car and the average speed of the car. Plot the acceleration of car as a function of time.

Answer to Problem 28P
The total distance traveled by car is
Explanation of Solution
Refer to the figure Problem 8.28 in the textbook for the speed versus time characteristics of the car.
During the initial 20 seconds, the speed of the car increases linearly from a value of zero to 60 mph. Therefore, the average speed of the car is 30 mph during this period. The distance traveled during this period is,
During the next 20 minutes the car moves with a constant speed of 60 mph and the distance traveled during this period is,
Because the car decelerates at a constant rate from a speed of 60 mph to 0 mph, the average speed of the car during the last 10 seconds is also 30 mph, and the distance traveled during this period is,
The total distance traveled is
Substitute 880 feet for
Give the expression for average speed of the car for the entire duration of travel as below.
Substitute
To plot the acceleration of car as a function of time, calculate the acceleration during the first 20 seconds, the next 20 minutes, and the last 10 seconds.
Calculate the acceleration of the car during the initial 20 seconds as below.
Note during this 20 seconds period, the speed of car changes from 0 to
During the next 20 minutes, the car moves with constant speed of 60 mph. Therefore, the acceleration is zero.
Show the plot of acceleration versus time as in Figure 1.
Conclusion:
Thus, the total distance traveled by car is
Want to see more full solutions like this?
Chapter 8 Solutions
LMS Integrated for MindTap Engineering, 2 terms (12 months) Printed Access Card for Moavni's Engineering Fundamentals: An Introduction to Engineering, 5th
- The ____________ costs can often be the determining factor in a successful project. Group of answer choices Overhead Material Labor Profitarrow_forwardWho is responsible for conducting special inspections and ensuring the work completed complies with design documents and referenced standards, why are specical inspections required?arrow_forwardYou are viewing Attempt 1/Continue Work * Incorrect The 123-kg industrial door with mass center at G is being positioned for repair by insertion of the 8° wedge under corner B. Horizontal movement is prevented by the small ledge at corner A. If the coefficients of static friction at both the top and bottom wedge surfaces are 0.65, determine the force P required to lift the door at B. Assume a = 1.4 m, b = 1.2 m, a = 8° A Answer: P = 1144.28 N Barrow_forward
- How can new sustainable materials change dead load calculations in future designs in earthquake-prone areas?arrow_forwardGiven the truss with loading shown. Note that the roller connection at Joint D is in atrack so that it cannot move in the x-direction, but it can roll in the y-direction.Solve the truss with the virtual load you would use if you are going to solve for the verticaldeflection at Joint E using the method of virtual work.Note: Just solve the truss. You DO NOT need to find the vertical deflection at Joint E.arrow_forwardQuestion (1): (18 Marks) Gaza City has a total population of 650,000 inhabitant, where 75% of the population is connected to wastewater collection system. The water consumption per capita is 100 L/day. Currently, the collected flow treated partially by aerated lagoon system. The municipality intend to change the treatment system to a completely mixed activated sludge system to be used for organic matter removal only to fulfill the Palestinian standards for reuse (Soluble BOD 30 mg/l). The given data from the municipality laboratory and assumptions: ⚫ The influent soluble Biological Oxygen demand = 500 mg/l. Biomass yield (Y) = 0.5 mg VSS/mg BOD removed • Endogenous decay rate constant (Ka) = 0.05d¹ • • The concentration of biomass (X) = 3000 mg MLVSS The concentration of recycled biomass (X) = 10000 mg MLVSS/L Growth rate (d) 2.5 1.25 100 For the completely mixed activated sludge system find the following: a) The average flow to the treatment plant. b) The mean cell residence time. c)…arrow_forward
- Question (3): (20 Marks) You have been assigned to design a secondary wastewater treatment component based on a tricking filter technique. The flow rate is 3500 m³/day, the raw wastewater has a BOD5 of 600 mg/l. This wastewater is primarily treated with an efficiency of 35%. • Assume suitable design criteria to obtain a BOD effluent of 15 mg/l. Design the secondary clarifier • Perform all the necessary cheeks on your design.arrow_forwardQuestion (3): (20 Marks) You have been assigned to design a secondary wastewater treatment component based on a tricking filter technique. The flow rate is 3500 m³/day, the raw wastewater has a BOD5 of 600 mg/l. This wastewater is primarily treated with an efficiency of 35%. • Assume suitable design criteria to obtain a BOD effluent of 15 mg/l. Design the secondary clarifier • Perform all the necessary cheeks on your design.arrow_forwardData:Total budget = $25,000BCWS = $ 8,333BCWP = $ 6,400ACWP = $ 7,800Project duration = 40 daysData date: 10 days Perform the following analyses of the project based on the data given above.a. Cost Variance b. Schedule Variancearrow_forward
- Please explain why large initial separations on the EV S-Curve between the lines for ACWPand BCWP with BCWP above the ACWP may be an indicator of excessive front loading.arrow_forwardData:Total budget = $25,000BCWS = $ 8,333BCWP = $ 6,400ACWP = $ 7,800Project duration = 40 daysData date: 10 days Plot an S-Curve and show Cost Variance and Schedule Variance on it.arrow_forwardWater table A L₁ = 2 m Sand y = 15.9 kN/m³ c' = 0 $' = 32° E L₂ = 3 m D Determine: a) Theoretical Depth and actual depth of penetration Sand Ysat 19.33 kN/m³ c' = 0 $' = 32° Clay c = 47 kN/m² =0arrow_forward
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage LearningTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning