
Divide the example problem 8.3 in chapter 8 using the 4.2 section described in textbook into the format “Given” ,“Find” , and “Solution”.

Answer to Problem 25P
The example problem 8.3 in chapter 8 is divided using the 4.2 section described in textbook into the format “Given” ,“Find” , and “Solution”, and the total distance travelled by the car is
Explanation of Solution
Given:
Car accelerates at speed of
The car moves with constant speed of
The car decelerates to a full stop in 10 seconds.
Find:
Find the total distance travelled by the car and also find its average speed over this distance.
Solution:
The car speed is linearly increased from zero to
Therefore, the average speed of the car is
Formula to determine the distance travelled during this period
For the next 30 minutes (1800 s), the car travels with a constant speed of
Formula to determine the distance travelled during this period
For the last 10 sec, the car decelerates at a constant speed of
Therefore, the average speed of the car during the last 10 sec is also
Formula to determine the distance travelled during this period
Formula to determine the total distance covered by the car is,
Convert the unit of total distance from m to km
Formula to determine the average speed of the car for the entire duration of the travel is,
Convert the unit of average speed from
Conclusion:
Hence, the example problem 8.3 in chapter 8 is divided using the 4.2 section described in textbook into the format “Given” ,“Find” , and “Solution”,
Want to see more full solutions like this?
Chapter 4 Solutions
LMS Integrated for MindTap Engineering, 2 terms (12 months) Printed Access Card for Moavni's Engineering Fundamentals: An Introduction to Engineering, 5th
- Given the truss with loading shown. Note that the roller connection at Joint D is in atrack so that it cannot move in the x-direction, but it can roll in the y-direction.Solve the truss with the virtual load you would use if you are going to solve for the verticaldeflection at Joint E using the method of virtual work.Note: Just solve the truss. You DO NOT need to find the vertical deflection at Joint E.arrow_forwardQuestion (1): (18 Marks) Gaza City has a total population of 650,000 inhabitant, where 75% of the population is connected to wastewater collection system. The water consumption per capita is 100 L/day. Currently, the collected flow treated partially by aerated lagoon system. The municipality intend to change the treatment system to a completely mixed activated sludge system to be used for organic matter removal only to fulfill the Palestinian standards for reuse (Soluble BOD 30 mg/l). The given data from the municipality laboratory and assumptions: ⚫ The influent soluble Biological Oxygen demand = 500 mg/l. Biomass yield (Y) = 0.5 mg VSS/mg BOD removed • Endogenous decay rate constant (Ka) = 0.05d¹ • • The concentration of biomass (X) = 3000 mg MLVSS The concentration of recycled biomass (X) = 10000 mg MLVSS/L Growth rate (d) 2.5 1.25 100 For the completely mixed activated sludge system find the following: a) The average flow to the treatment plant. b) The mean cell residence time. c)…arrow_forwardQuestion (3): (20 Marks) You have been assigned to design a secondary wastewater treatment component based on a tricking filter technique. The flow rate is 3500 m³/day, the raw wastewater has a BOD5 of 600 mg/l. This wastewater is primarily treated with an efficiency of 35%. • Assume suitable design criteria to obtain a BOD effluent of 15 mg/l. Design the secondary clarifier • Perform all the necessary cheeks on your design.arrow_forward
- Question (3): (20 Marks) You have been assigned to design a secondary wastewater treatment component based on a tricking filter technique. The flow rate is 3500 m³/day, the raw wastewater has a BOD5 of 600 mg/l. This wastewater is primarily treated with an efficiency of 35%. • Assume suitable design criteria to obtain a BOD effluent of 15 mg/l. Design the secondary clarifier • Perform all the necessary cheeks on your design.arrow_forwardData:Total budget = $25,000BCWS = $ 8,333BCWP = $ 6,400ACWP = $ 7,800Project duration = 40 daysData date: 10 days Perform the following analyses of the project based on the data given above.a. Cost Variance b. Schedule Variancearrow_forwardPlease explain why large initial separations on the EV S-Curve between the lines for ACWPand BCWP with BCWP above the ACWP may be an indicator of excessive front loading.arrow_forward
- Data:Total budget = $25,000BCWS = $ 8,333BCWP = $ 6,400ACWP = $ 7,800Project duration = 40 daysData date: 10 days Plot an S-Curve and show Cost Variance and Schedule Variance on it.arrow_forwardWater table A L₁ = 2 m Sand y = 15.9 kN/m³ c' = 0 $' = 32° E L₂ = 3 m D Determine: a) Theoretical Depth and actual depth of penetration Sand Ysat 19.33 kN/m³ c' = 0 $' = 32° Clay c = 47 kN/m² =0arrow_forward3. The following Sheet Pile is to be designed for a granular soil without the influence of the water table: Determine: L = 5m Y = 15.9kN/m³ $' = 32° Gall = 172MN/m² e) Theoretical Embedment Deptharrow_forward
- 3. The following Sheet Pile is to be designed for a granular soil without the influence of the water table: Determine: L = 5m y = 15.9kN/m³ $'=32° Gall = 172MN/m² f) Actual Embedment depth taking into account a 30% increasearrow_forward3. The following Sheet Pile is to be designed for a granular soil without the influence of the water table: L = 5m y = 15.9kN/m³ $' = 32° = Gall 172MN/m² Determine: g) Minimum section modulusarrow_forward1. Given: Determine: Water table E L₁ = 2 m Sand y = 15.9 kN/m³ c' = 0 '=32° L₂ = 3 m Sand Ysat 19.33 kN/m³ c' = 0 $' = 32° D b) Minimum section modulus where σall = 172.5MN/m² Clay c = 47 kN/m² =0arrow_forward
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage LearningResidential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781285852225Author:Gregory W FletcherPublisher:Cengage Learning

