Second Quarter 2023 SPEC OMP2012 Results

These results have been submitted to SPEC; see the disclaimer before studying any results.

Last update: Saturday, 1 July 2023, 11:07

Published Results (4):


OMPG2012 (4):

[Search in OMPG2012 results]

Test Sponsor System Name Base
Threads
Processor Results Energy
Enabled
Cores
Enabled
Chips
Cores/
Chip
Threads/
Core
Base Peak Base Peak
Cisco Systems Cisco UCS X410c M7 (Intel Xeon Platinum 8490H)
HTML | CSV | Text | PDF | PS | Config
240 240 4 60 1 84.4 Not Run  -- --
Lenovo Global Technology ThinkSystem SR665V3(AMD EPYC 9754, 2.25GHz)
HTML | CSV | Text | PDF | PS | Config
512 256 2 128 2 91.6 93.6 -- --
Lenovo Global Technology ThinkSystem SR655V3(AMD EPYC 9754, 2.25GHz)
HTML | CSV | Text | PDF | PS | Config
256 128 1 128 2 52.7 53.4 -- --
Supermicro SuperServer SYS-241H-TNRTTP (Intel Xeon Platinum 8490H)
HTML | CSV | Text | PDF | PS | Config
480 240 4 60 2 70.8 Not Run  -- --

[Back to OMP2012 Results]

W3C XHTML 1.0
W3C CSS