The SeaMade Project is a joint venture between Otary, Eneco and Ocean Winds.
The project consists of two concession zones in the Belgian North Sea: Seastar and Mermaid, both projects are situated in a large zone of nine wind farm projects near the Dutch border. Seastar have 30 wind turbines and a total capacity of 252MW, and Mermaid have 28 wind turbine wind farm and a total capacity of 235MW.
The SeaMade wind turbines are operational and produce green energy since 2020.