Finished tiling the floor of the bathroom and grouted it so the vanity and toilet could be installed whilst we are in the land of sun. My brother came over Saturday and we were able to cut and lay the bathroom. Then after he left I laid all whole tile until I had to stop to get ready for a party. Sunday I finished laying all the tile down the hall while Kori grouted the bathroom. Some amazing coincidence the hallway's length is exactly divisible by the length of the tile.
So tomorrow I cut and lay the rest of the floor tile.
-Blake
Sunday, December 21, 2008
Wednesday, December 17, 2008
My life is tile, tile is king.
Here are pics of the first tile job.
Tile selection:
The pattern (I fixed the triangles) of the runners:
This is not the way to lay tile. I laid the runners first and though I got one angle really well done the other was not so good.
Laid from the center (focal point). just turn your head for full effect.
Here is all the tile laid, just waiting on the grout.
Final Product
-Blake
Tile selection:
The pattern (I fixed the triangles) of the runners:
This is not the way to lay tile. I laid the runners first and though I got one angle really well done the other was not so good.
Laid from the center (focal point). just turn your head for full effect.
Here is all the tile laid, just waiting on the grout.
Final Product
-Blake
Subscribe to:
Posts (Atom)